chief designer: Ing.arch. Jakub Volka
general designer: Stopro spol. s r.o.
investment costs: 180 mil. CZK
location: Prague 6 - Suchdol
client: Czech University of Life Sciences Prague
constr. realization: 02/2016-07/2017

By construction of the Centre for Economics and Managerial Studies II (CEMS 2) of the CULS Faculty of Economics and Management (PEF) was the second stage of planned completion building finished. The first stage was completed in year 2006.
 

The construction of the second stage extent the building PEF and CEMS 1 with other education and office premises by extension of the connection atrium of CEMS 1 and construction of the new building parallel with original building from the year 1964. The faculty by this was extended by 7 new seminar rooms for 30 persons, 2 lecture rooms for 60 persons, representative conference room for 72 persons, multifunctional seminar room with movable partition for 2x36 or 1x72 persons, 14 class rooms for 24 persons and offices for teachers. In the basement the storages, archives and bicycle room with washing were added. In the 1st floor a new snack bar with seating attached to relax area was created.
 

The extension of CEMS was proposed to complete the realisation of the 1st stage. Its ground plan reminds letter H. Floors of both left and right part follow the height of the existing building PEF, it is 5 storeys with one basement and four overground floors, only the central part has fifth floor with technical facilities of the building. Communication hall is three-storeys with one basement and two overground floors. The building is solved in the style of whole compound – grey skeleton, window sills covered with glass mosaic (in this case red one), grey aluminium windows. Other significant colour is used for sun-shading lamellas – blue. By this in combination with green natural neighbourhood arises multicolour building with young expression, which in the same time respects facts of the environment and style of the original building.
 

The STOPRO company elaborated the documentation for the change of building permit, for the contractor tender and assignment and secured the author’s supervision.

 

Inbuilt area: 1 720 sqm
Inbuilt volume: 24 006 cum
Total gross floor area: 6 373 sqm
 

go back.

  • CULS CEMS II
  • CULS CEMS II
  • CULS CEMS II
  • CULS CEMS II
  • CULS CEMS II
  • CULS CEMS II
  • CULS CEMS II

© 2007-2018 STOPRO spol. s r.o. ■ SitemapWebsite informationRSSCMS

Created & hosted Nux s.r.o.