STOPRO spol. s r.o. STOPRO spol. s r.o. | Architecture - Design - Engineering

Spa Teplice nad Bečvou - Swimming pool

Loading…
Loading

Architect, General designer

architect: Ing. Lukáš Srch
  Ing. Jiří Beran
  Ing. arch. Pavel Hrček
  Ing. arch. Alena Hrčková
  Ing. arch. Šárka Pácová
chief designer: Ing. Lukáš Srch
  Ing. Jiří Beran
client: Lázně Teplice nad Bečvou, a.s.
investment costs: 14 mil. CZK ( interior 4,5 mil. CZK)
location: Lázně Teplice nad Bečvou
architect (interior): Ing. Lukáš Zimandl
  Ing.arch. Tereza Musilová
constr. realization: 2012
design: 2012

In accordance with long-term trends in the area of services and raising standards for clients in Spa Teplice nad Bečvou investor proceeded to the next stage of the revitalization of the complex spa - Spa House Janáček.
There were built a new swimming pool in the area of the existing atrium. The swimming pool is made of stainless steel, size 5x15 m is designed for rehabilitation purposes and treatment of musculoskeletal disorders. The perimeter walls were lined with Lacobel and lightened with LED system, which is hidden in the acoustic ceiling system. There is steam room too next to the swimming pool.
Reconstruction of existing facilities and construction of new parts of the building (swimming pool, cafe, bowling and common areas) were a challenge for Stopro Architects. They tried to find the optimal solution within the specification. The project was limited to a short time and investment costs.

Area:            410 m2


 

go back.


© 2007-2018 STOPRO spol. s r.o. ■ SitemapWebsite informationRSSCMS

Created & hosted Nux s.r.o.